Edition 2: October 2026
This edition covers producer prices through September 2026 for six construction-material groups, with five years of history behind each, and reports what changed since the first edition. It is written for anyone revisiting the material assumptions behind an estimate or weighing an explanation for a proposed increase. It reports market evidence. It does not estimate any contractor's cost and draws no conclusion about any contract.
The read
The pattern from the first edition held. Copper, steel and aluminum products remain far above a year ago; gypsum and concrete remain close to flat. In the producer price index, copper wire and cable is 30.8% above September 2025, steel mill products 27.6% and aluminum mill shapes 25.2%. Gypsum products (+1.4%) and ready-mix concrete (+2.3%) moved little over the same year, and the cement index is 1.2% lower. Softwood lumber is 14.2% above September 2025, but that comparison is with a weak September: lumber is still 1.0% below where it stood five years ago.
September itself was quiet for most of the six. Steel mill products rose 2.2%, the largest monthly increase among them. Copper wire and cable rose 0.8% and set another five-year high. Gypsum products rose 0.8%, also to a five-year high. Aluminum mill shapes slipped 0.1%, ready-mix concrete was unchanged, and softwood lumber fell 2.0%, after a decline in August. BLS marks all six September values preliminary.
A claim that "materials are up 25% or more" still fits the metals and still does not fit gypsum, concrete or cement. Which part of an estimate it bears on depends on what the work is made of; the comparison table is arranged so that a reader can check the categories that matter to a particular estimate rather than a general claim.
The comparison
| Measure | Identifier | Latest period | Value | Month over month | Year over year | Source and status |
|---|---|---|---|---|---|---|
| Softwood lumber: PPI, softwood lumber | WPU0811 | Sep 2026 | 288.6 (index, 1982=100) | −2.0% | +14.2% | BLS PPI, preliminary |
| Copper: PPI, copper wire and cable | WPU10260314 | Sep 2026 | 607.7 (index, Dec 1986=100) | +0.8% | +30.8% | BLS PPI, preliminary |
| Steel: PPI, steel mill products | WPU1017 | Sep 2026 | 388.6 (index, 1982=100) | +2.2% | +27.6% | BLS PPI, preliminary |
| Aluminum: PPI, aluminum mill shapes | WPU102501 | Sep 2026 | 370.5 (index, 1982=100) | −0.1% | +25.2% | BLS PPI, preliminary |
| Gypsum products: PPI, gypsum products | WPU137 | Sep 2026 | 488.9 (index, 1982=100) | +0.8% | +1.4% | BLS PPI, preliminary |
| Ready-mix concrete: PPI, ready-mix concrete | WPU1333 | Sep 2026 | 395.3 (index, 1982=100) | +0.0% | +2.3% | BLS PPI, preliminary |
Context measures, each with its own latest period:
| Measure | Identifier | Latest period | Value | Month over month | Year over year | Source and status |
|---|---|---|---|---|---|---|
| PPI, cement (hydraulic) | WPU1322 | Sep 2026 | 356.2 (index, 1982=100) | +0.0% | −1.2% | BLS PPI, preliminary |
| PPI, gypsum building materials | WPU13710102 | Sep 2026 | 367.0 (index, Dec 1993=100) | +0.0% | −0.4% | BLS PPI, preliminary |
| LME copper, monthly average (USD per metric ton) | wb_copper_usd_mt | Sep 2026 | 14,474 | +1.0% | +45.0% | World Bank Pink Sheet, as published |
| LME aluminum, monthly average (USD per metric ton) | wb_aluminum_usd_mt | Sep 2026 | 3,283 | +1.0% | +23.7% | World Bank Pink Sheet, as published |
| Cement shipments, U.S. plants (metric tons) | usgs_cement_shipments_us_mt | Jun 2026 | 8,255,542 | +12.5% | +10.4% | USGS MIS, estimated |
| Housing starts, total, SAAR (thousands) | census_starts_total_saar | Sep 2026 | 1,221 | −5.2% | −7.4% | Census NRC, as published |
| Housing starts, single-family, SAAR (thousands) | census_starts_1unit_saar | Sep 2026 | 859 | −4.6% | +2.6% | Census NRC, as published |
Index levels are not comparable across rows; each series has its own base period. Two-year comparisons, against September 2024: lumber +12.6%; copper wire and cable +46.3%; steel +43.4%; aluminum mill shapes +57.6%; gypsum products +2.3%; ready-mix concrete +2.7%.
Historical charts
Each core index over 5 years, on its own scale, then the raw-metal benchmarks, then the six together rebased to a common start. Charts are drawn from series.csv; every value is in the table under each chart.
Values in this chart
| Period | PPI, softwood lumber |
|---|---|
| Oct 2021 | 291.5 |
| Nov 2021 | 309.0 |
| Dec 2021 | 384.5 |
| Jan 2022 | 480.6 |
| Feb 2022 | 504.8 |
| Mar 2022 | 540.7 |
| Apr 2022 | 443.7 |
| May 2022 | 453.3 |
| Jun 2022 | 337.4 |
| Jul 2022 | 337.8 |
| Aug 2022 | 326.0 |
| Sep 2022 | 309.1 |
| Oct 2022 | 303.0 |
| Nov 2022 | 299.4 |
| Dec 2022 | 282.7 |
| Jan 2023 | 268.0 |
| Feb 2023 | 277.2 |
| Mar 2023 | 274.3 |
| Apr 2023 | 271.2 |
| May 2023 | 270.9 |
| Jun 2023 | 267.4 |
| Jul 2023 | 279.4 |
| Aug 2023 | 266.6 |
| Sep 2023 | 262.0 |
| Oct 2023 | 253.5 |
| Nov 2023 | 240.8 |
| Dec 2023 | 241.4 |
| Jan 2024 | 244.3 |
| Feb 2024 | 247.9 |
| Mar 2024 | 255.8 |
| Apr 2024 | 258.2 |
| May 2024 | 248.9 |
| Jun 2024 | 247.3 |
| Jul 2024 | 242.8 |
| Aug 2024 | 249.9 |
| Sep 2024 | 256.2 |
| Oct 2024 | 260.4 |
| Nov 2024 | 269.3 |
| Dec 2024 | 272.4 |
| Jan 2025 | 267.5 |
| Feb 2025 | 274.9 |
| Mar 2025 | 288.0 |
| Apr 2025 | 280.4 |
| May 2025 | 271.5 |
| Jun 2025 | 266.3 |
| Jul 2025 | 261.4 |
| Aug 2025 | 263.7 |
| Sep 2025 | 252.8 |
| Oct 2025 | 251.0 |
| Nov 2025 | 251.4 |
| Dec 2025 | 250.1 |
| Jan 2026 | 260.0 |
| Feb 2026 | 270.3 |
| Mar 2026 | 268.3 |
| Apr 2026 | 282.9 |
| May 2026 | 284.5 |
| Jun 2026 | 282.5 |
| Jul 2026 | 300.5 |
| Aug 2026 | 294.5 |
| Sep 2026 | 288.6 |
Values in this chart
| Period | PPI, copper wire and cable |
|---|---|
| Oct 2021 | 401.8 |
| Nov 2021 | 411.8 |
| Dec 2021 | 402.5 |
| Jan 2022 | 405.0 |
| Feb 2022 | 409.0 |
| Mar 2022 | 416.2 |
| Apr 2022 | 425.9 |
| May 2022 | 419.8 |
| Jun 2022 | 405.2 |
| Jul 2022 | 387.7 |
| Aug 2022 | 367.0 |
| Sep 2022 | 367.8 |
| Oct 2022 | 366.3 |
| Nov 2022 | 376.1 |
| Dec 2022 | 381.1 |
| Jan 2023 | 399.4 |
| Feb 2023 | 408.9 |
| Mar 2023 | 404.2 |
| Apr 2023 | 401.4 |
| May 2023 | 383.1 |
| Jun 2023 | 384.5 |
| Jul 2023 | 385.7 |
| Aug 2023 | 384.2 |
| Sep 2023 | 381.1 |
| Oct 2023 | 377.1 |
| Nov 2023 | 378.3 |
| Dec 2023 | 383.9 |
| Jan 2024 | 385.6 |
| Feb 2024 | 389.2 |
| Mar 2024 | 393.2 |
| Apr 2024 | 416.1 |
| May 2024 | 458.5 |
| Jun 2024 | 451.3 |
| Jul 2024 | 433.3 |
| Aug 2024 | 414.0 |
| Sep 2024 | 415.2 |
| Oct 2024 | 427.0 |
| Nov 2024 | 419.1 |
| Dec 2024 | 413.0 |
| Jan 2025 | 417.4 |
| Feb 2025 | 424.9 |
| Mar 2025 | 450.7 |
| Apr 2025 | 472.7 |
| May 2025 | 459.2 |
| Jun 2025 | 467.0 |
| Jul 2025 | 490.2 |
| Aug 2025 | 473.5 |
| Sep 2025 | 464.5 |
| Oct 2025 | 486.1 |
| Nov 2025 | 486.9 |
| Dec 2025 | 510.8 |
| Jan 2026 | 530.9 |
| Feb 2026 | 537.9 |
| Mar 2026 | 536.8 |
| Apr 2026 | 533.8 |
| May 2026 | 564.9 |
| Jun 2026 | 577.2 |
| Jul 2026 | 578.7 |
| Aug 2026 | 602.7 |
| Sep 2026 | 607.7 |
Values in this chart
| Period | PPI, steel mill products |
|---|---|
| Oct 2021 | 435.7 |
| Nov 2021 | 448.7 |
| Dec 2021 | 449.7 |
| Jan 2022 | 441.5 |
| Feb 2022 | 400.1 |
| Mar 2022 | 376.6 |
| Apr 2022 | 386.7 |
| May 2022 | 427.4 |
| Jun 2022 | 420.2 |
| Jul 2022 | 404.1 |
| Aug 2022 | 384.9 |
| Sep 2022 | 357.6 |
| Oct 2022 | 337.2 |
| Nov 2022 | 326.7 |
| Dec 2022 | 315.6 |
| Jan 2023 | 308.0 |
| Feb 2023 | 315.3 |
| Mar 2023 | 318.2 |
| Apr 2023 | 329.7 |
| May 2023 | 347.2 |
| Jun 2023 | 345.8 |
| Jul 2023 | 329.4 |
| Aug 2023 | 322.9 |
| Sep 2023 | 311.5 |
| Oct 2023 | 304.1 |
| Nov 2023 | 298.0 |
| Dec 2023 | 305.1 |
| Jan 2024 | 321.4 |
| Feb 2024 | 332.5 |
| Mar 2024 | 305.7 |
| Apr 2024 | 297.6 |
| May 2024 | 298.6 |
| Jun 2024 | 293.3 |
| Jul 2024 | 283.1 |
| Aug 2024 | 275.3 |
| Sep 2024 | 271.0 |
| Oct 2024 | 273.4 |
| Nov 2024 | 278.3 |
| Dec 2024 | 266.5 |
| Jan 2025 | 261.6 |
| Feb 2025 | 268.9 |
| Mar 2025 | 287.4 |
| Apr 2025 | 303.8 |
| May 2025 | 326.7 |
| Jun 2025 | 309.2 |
| Jul 2025 | 305.5 |
| Aug 2025 | 308.8 |
| Sep 2025 | 304.6 |
| Oct 2025 | 300.7 |
| Nov 2025 | 291.6 |
| Dec 2025 | 312.4 |
| Jan 2026 | 315.4 |
| Feb 2026 | 325.1 |
| Mar 2026 | 331.4 |
| Apr 2026 | 341.6 |
| May 2026 | 350.0 |
| Jun 2026 | 360.0 |
| Jul 2026 | 374.5 |
| Aug 2026 | 380.3 |
| Sep 2026 | 388.6 |
Values in this chart
| Period | PPI, aluminum mill shapes |
|---|---|
| Oct 2021 | 253.8 |
| Nov 2021 | 258.9 |
| Dec 2021 | 244.0 |
| Jan 2022 | 253.8 |
| Feb 2022 | 271.4 |
| Mar 2022 | 278.2 |
| Apr 2022 | 287.6 |
| May 2022 | 278.6 |
| Jun 2022 | 262.3 |
| Jul 2022 | 251.0 |
| Aug 2022 | 242.1 |
| Sep 2022 | 238.8 |
| Oct 2022 | 231.7 |
| Nov 2022 | 228.2 |
| Dec 2022 | 231.1 |
| Jan 2023 | 236.3 |
| Feb 2023 | 240.3 |
| Mar 2023 | 240.4 |
| Apr 2023 | 236.0 |
| May 2023 | 237.0 |
| Jun 2023 | 234.7 |
| Jul 2023 | 231.7 |
| Aug 2023 | 230.9 |
| Sep 2023 | 228.8 |
| Oct 2023 | 227.9 |
| Nov 2023 | 227.6 |
| Dec 2023 | 226.8 |
| Jan 2024 | 225.1 |
| Feb 2024 | 225.5 |
| Mar 2024 | 224.4 |
| Apr 2024 | 225.7 |
| May 2024 | 235.6 |
| Jun 2024 | 241.1 |
| Jul 2024 | 242.4 |
| Aug 2024 | 237.1 |
| Sep 2024 | 235.1 |
| Oct 2024 | 238.8 |
| Nov 2024 | 244.7 |
| Dec 2024 | 246.6 |
| Jan 2025 | 246.9 |
| Feb 2025 | 249.6 |
| Mar 2025 | 262.1 |
| Apr 2025 | 266.7 |
| May 2025 | 257.1 |
| Jun 2025 | 256.7 |
| Jul 2025 | 276.1 |
| Aug 2025 | 291.3 |
| Sep 2025 | 295.9 |
| Oct 2025 | 301.5 |
| Nov 2025 | 312.0 |
| Dec 2025 | 320.6 |
| Jan 2026 | 328.7 |
| Feb 2026 | 349.4 |
| Mar 2026 | 353.2 |
| Apr 2026 | 367.8 |
| May 2026 | 385.1 |
| Jun 2026 | 394.4 |
| Jul 2026 | 388.1 |
| Aug 2026 | 370.9 |
| Sep 2026 | 370.5 |
Values in this chart
| Period | PPI, gypsum products |
|---|---|
| Oct 2021 | 396.9 |
| Nov 2021 | 397.2 |
| Dec 2021 | 398.0 |
| Jan 2022 | 417.5 |
| Feb 2022 | 415.2 |
| Mar 2022 | 421.7 |
| Apr 2022 | 422.2 |
| May 2022 | 445.5 |
| Jun 2022 | 448.1 |
| Jul 2022 | 449.2 |
| Aug 2022 | 461.3 |
| Sep 2022 | 462.7 |
| Oct 2022 | 461.3 |
| Nov 2022 | 463.0 |
| Dec 2022 | 462.4 |
| Jan 2023 | 462.2 |
| Feb 2023 | 466.7 |
| Mar 2023 | 469.5 |
| Apr 2023 | 465.1 |
| May 2023 | 460.9 |
| Jun 2023 | 460.0 |
| Jul 2023 | 459.0 |
| Aug 2023 | 458.1 |
| Sep 2023 | 455.9 |
| Oct 2023 | 455.9 |
| Nov 2023 | 455.6 |
| Dec 2023 | 454.8 |
| Jan 2024 | 454.8 |
| Feb 2024 | 464.4 |
| Mar 2024 | 471.9 |
| Apr 2024 | 468.6 |
| May 2024 | 477.0 |
| Jun 2024 | 477.0 |
| Jul 2024 | 477.3 |
| Aug 2024 | 477.1 |
| Sep 2024 | 477.9 |
| Oct 2024 | 477.3 |
| Nov 2024 | 479.9 |
| Dec 2024 | 480.5 |
| Jan 2025 | 479.8 |
| Feb 2025 | 485.5 |
| Mar 2025 | 487.4 |
| Apr 2025 | 485.1 |
| May 2025 | 483.9 |
| Jun 2025 | 483.7 |
| Jul 2025 | 483.4 |
| Aug 2025 | 484.0 |
| Sep 2025 | 482.1 |
| Oct 2025 | 482.3 |
| Nov 2025 | 480.8 |
| Dec 2025 | 480.2 |
| Jan 2026 | 480.3 |
| Feb 2026 | 480.7 |
| Mar 2026 | 479.5 |
| Apr 2026 | 480.4 |
| May 2026 | 475.1 |
| Jun 2026 | 477.5 |
| Jul 2026 | 481.6 |
| Aug 2026 | 484.8 |
| Sep 2026 | 488.9 |
Values in this chart
| Period | PPI, ready-mix concrete | PPI, cement (hydraulic) |
|---|---|---|
| Oct 2021 | 300.6 | 275.3 |
| Nov 2021 | 303.3 | 273.9 |
| Dec 2021 | 304.5 | 274.4 |
| Jan 2022 | 309.6 | 283.9 |
| Feb 2022 | 313.7 | 285.6 |
| Mar 2022 | 313.7 | 285.6 |
| Apr 2022 | 318.9 | 290.6 |
| May 2022 | 319.5 | 290.7 |
| Jun 2022 | 322.3 | 291.7 |
| Jul 2022 | 328.7 | 299.4 |
| Aug 2022 | 332.9 | 302.4 |
| Sep 2022 | 336.0 | 304.5 |
| Oct 2022 | 337.5 | 308.7 |
| Nov 2022 | 340.9 | 309.9 |
| Dec 2022 | 344.2 | 310.1 |
| Jan 2023 | 350.1 | 325.2 |
| Feb 2023 | 352.0 | 329.2 |
| Mar 2023 | 355.2 | 329.7 |
| Apr 2023 | 357.6 | 330.0 |
| May 2023 | 362.1 | 332.0 |
| Jun 2023 | 360.7 | 331.7 |
| Jul 2023 | 363.3 | 334.5 |
| Aug 2023 | 367.6 | 335.3 |
| Sep 2023 | 371.5 | 336.6 |
| Oct 2023 | 371.9 | 337.8 |
| Nov 2023 | 372.7 | 337.9 |
| Dec 2023 | 368.0 | 337.7 |
| Jan 2024 | 376.4 | 348.8 |
| Feb 2024 | 380.4 | 349.1 |
| Mar 2024 | 386.1 | 351.6 |
| Apr 2024 | 383.5 | 353.2 |
| May 2024 | 384.2 | 354.3 |
| Jun 2024 | 382.0 | 353.7 |
| Jul 2024 | 383.6 | 354.3 |
| Aug 2024 | 386.4 | 354.3 |
| Sep 2024 | 384.9 | 353.6 |
| Oct 2024 | 385.4 | 353.1 |
| Nov 2024 | 387.5 | 353.1 |
| Dec 2024 | 385.9 | 353.0 |
| Jan 2025 | 390.3 | 356.9 |
| Feb 2025 | 389.5 | 356.5 |
| Mar 2025 | 388.5 | 358.2 |
| Apr 2025 | 386.1 | 358.7 |
| May 2025 | 387.5 | 360.1 |
| Jun 2025 | 387.4 | 360.1 |
| Jul 2025 | 386.0 | 360.0 |
| Aug 2025 | 386.4 | 360.1 |
| Sep 2025 | 386.3 | 360.5 |
| Oct 2025 | 385.6 | 357.9 |
| Nov 2025 | 383.9 | 356.0 |
| Dec 2025 | 386.2 | 355.6 |
| Jan 2026 | 390.2 | 355.3 |
| Feb 2026 | 390.1 | 356.0 |
| Mar 2026 | 391.0 | 355.9 |
| Apr 2026 | 392.9 | 357.9 |
| May 2026 | 394.1 | 357.5 |
| Jun 2026 | 396.0 | 357.5 |
| Jul 2026 | 394.9 | 355.6 |
| Aug 2026 | 395.3 | 356.1 |
| Sep 2026 | 395.3 | 356.2 |
Values in this chart
| Period | LME copper, USD per metric ton |
|---|---|
| Oct 2021 | 9,829 |
| Nov 2021 | 9,729 |
| Dec 2021 | 9,551 |
| Jan 2022 | 9,782 |
| Feb 2022 | 9,943 |
| Mar 2022 | 10,231 |
| Apr 2022 | 10,161 |
| May 2022 | 9,377 |
| Jun 2022 | 9,024 |
| Jul 2022 | 7,545 |
| Aug 2022 | 7,982 |
| Sep 2022 | 7,746 |
| Oct 2022 | 7,651 |
| Nov 2022 | 8,050 |
| Dec 2022 | 8,375 |
| Jan 2023 | 9,038 |
| Feb 2023 | 8,937 |
| Mar 2023 | 8,856 |
| Apr 2023 | 8,809 |
| May 2023 | 8,217 |
| Jun 2023 | 8,397 |
| Jul 2023 | 8,477 |
| Aug 2023 | 8,349 |
| Sep 2023 | 8,277 |
| Oct 2023 | 7,937 |
| Nov 2023 | 8,190 |
| Dec 2023 | 8,400 |
| Jan 2024 | 8,339 |
| Feb 2024 | 8,305 |
| Mar 2024 | 8,689 |
| Apr 2024 | 9,464 |
| May 2024 | 10,139 |
| Jun 2024 | 9,648 |
| Jul 2024 | 9,385 |
| Aug 2024 | 8,972 |
| Sep 2024 | 9,237 |
| Oct 2024 | 9,534 |
| Nov 2024 | 9,076 |
| Dec 2024 | 8,916 |
| Jan 2025 | 8,991 |
| Feb 2025 | 9,331 |
| Mar 2025 | 9,740 |
| Apr 2025 | 9,177 |
| May 2025 | 9,533 |
| Jun 2025 | 9,835 |
| Jul 2025 | 9,771 |
| Aug 2025 | 9,670 |
| Sep 2025 | 9,984 |
| Oct 2025 | 10,740 |
| Nov 2025 | 10,812 |
| Dec 2025 | 11,785 |
| Jan 2026 | 13,012 |
| Feb 2026 | 12,951 |
| Mar 2026 | 12,529 |
| Apr 2026 | 12,951 |
| May 2026 | 13,543 |
| Jun 2026 | 13,552 |
| Jul 2026 | 13,543 |
| Aug 2026 | 14,326 |
| Sep 2026 | 14,474 |
Values in this chart
| Period | LME aluminum, USD per metric ton |
|---|---|
| Oct 2021 | 2,934 |
| Nov 2021 | 2,636 |
| Dec 2021 | 2,696 |
| Jan 2022 | 3,006 |
| Feb 2022 | 3,246 |
| Mar 2022 | 3,498 |
| Apr 2022 | 3,244 |
| May 2022 | 2,830 |
| Jun 2022 | 2,563 |
| Jul 2022 | 2,408 |
| Aug 2022 | 2,431 |
| Sep 2022 | 2,225 |
| Oct 2022 | 2,256 |
| Nov 2022 | 2,351 |
| Dec 2022 | 2,402 |
| Jan 2023 | 2,502 |
| Feb 2023 | 2,416 |
| Mar 2023 | 2,296 |
| Apr 2023 | 2,343 |
| May 2023 | 2,269 |
| Jun 2023 | 2,185 |
| Jul 2023 | 2,160 |
| Aug 2023 | 2,137 |
| Sep 2023 | 2,185 |
| Oct 2023 | 2,192 |
| Nov 2023 | 2,202 |
| Dec 2023 | 2,182 |
| Jan 2024 | 2,193 |
| Feb 2024 | 2,179 |
| Mar 2024 | 2,226 |
| Apr 2024 | 2,506 |
| May 2024 | 2,565 |
| Jun 2024 | 2,498 |
| Jul 2024 | 2,349 |
| Aug 2024 | 2,344 |
| Sep 2024 | 2,450 |
| Oct 2024 | 2,596 |
| Nov 2024 | 2,582 |
| Dec 2024 | 2,541 |
| Jan 2025 | 2,573 |
| Feb 2025 | 2,658 |
| Mar 2025 | 2,658 |
| Apr 2025 | 2,372 |
| May 2025 | 2,449 |
| Jun 2025 | 2,526 |
| Jul 2025 | 2,606 |
| Aug 2025 | 2,597 |
| Sep 2025 | 2,653 |
| Oct 2025 | 2,793 |
| Nov 2025 | 2,819 |
| Dec 2025 | 2,876 |
| Jan 2026 | 3,142 |
| Feb 2026 | 3,065 |
| Mar 2026 | 3,373 |
| Apr 2026 | 3,600 |
| May 2026 | 3,666 |
| Jun 2026 | 3,439 |
| Jul 2026 | 3,161 |
| Aug 2026 | 3,251 |
| Sep 2026 | 3,283 |
Values in this chart
| Period | Softwood lumber | Copper | Steel | Aluminum | Gypsum products | Ready-mix concrete |
|---|---|---|---|---|---|---|
| Oct 2021 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 |
| Nov 2021 | 106.0 | 102.5 | 103.0 | 102.0 | 100.1 | 100.9 |
| Dec 2021 | 131.9 | 100.2 | 103.2 | 96.2 | 100.3 | 101.3 |
| Jan 2022 | 164.9 | 100.8 | 101.3 | 100.0 | 105.2 | 103.0 |
| Feb 2022 | 173.1 | 101.8 | 91.8 | 107.0 | 104.6 | 104.3 |
| Mar 2022 | 185.5 | 103.6 | 86.4 | 109.6 | 106.2 | 104.3 |
| Apr 2022 | 152.2 | 106.0 | 88.8 | 113.3 | 106.4 | 106.1 |
| May 2022 | 155.5 | 104.5 | 98.1 | 109.8 | 112.3 | 106.3 |
| Jun 2022 | 115.7 | 100.9 | 96.4 | 103.4 | 112.9 | 107.2 |
| Jul 2022 | 115.9 | 96.5 | 92.8 | 98.9 | 113.2 | 109.3 |
| Aug 2022 | 111.8 | 91.4 | 88.3 | 95.4 | 116.2 | 110.7 |
| Sep 2022 | 106.0 | 91.5 | 82.1 | 94.1 | 116.6 | 111.7 |
| Oct 2022 | 103.9 | 91.2 | 77.4 | 91.3 | 116.2 | 112.3 |
| Nov 2022 | 102.7 | 93.6 | 75.0 | 89.9 | 116.7 | 113.4 |
| Dec 2022 | 97.0 | 94.8 | 72.4 | 91.1 | 116.5 | 114.5 |
| Jan 2023 | 91.9 | 99.4 | 70.7 | 93.1 | 116.5 | 116.5 |
| Feb 2023 | 95.1 | 101.8 | 72.4 | 94.7 | 117.6 | 117.1 |
| Mar 2023 | 94.1 | 100.6 | 73.0 | 94.7 | 118.3 | 118.2 |
| Apr 2023 | 93.0 | 99.9 | 75.7 | 93.0 | 117.2 | 119.0 |
| May 2023 | 92.9 | 95.3 | 79.7 | 93.4 | 116.1 | 120.4 |
| Jun 2023 | 91.7 | 95.7 | 79.4 | 92.5 | 115.9 | 120.0 |
| Jul 2023 | 95.8 | 96.0 | 75.6 | 91.3 | 115.7 | 120.8 |
| Aug 2023 | 91.4 | 95.6 | 74.1 | 91.0 | 115.4 | 122.3 |
| Sep 2023 | 89.9 | 94.9 | 71.5 | 90.2 | 114.9 | 123.6 |
| Oct 2023 | 86.9 | 93.9 | 69.8 | 89.8 | 114.9 | 123.7 |
| Nov 2023 | 82.6 | 94.2 | 68.4 | 89.7 | 114.8 | 124.0 |
| Dec 2023 | 82.8 | 95.5 | 70.0 | 89.4 | 114.6 | 122.4 |
| Jan 2024 | 83.8 | 96.0 | 73.8 | 88.7 | 114.6 | 125.2 |
| Feb 2024 | 85.0 | 96.9 | 76.3 | 88.9 | 117.0 | 126.5 |
| Mar 2024 | 87.7 | 97.9 | 70.2 | 88.4 | 118.9 | 128.4 |
| Apr 2024 | 88.6 | 103.6 | 68.3 | 88.9 | 118.1 | 127.6 |
| May 2024 | 85.4 | 114.1 | 68.5 | 92.8 | 120.2 | 127.8 |
| Jun 2024 | 84.8 | 112.3 | 67.3 | 95.0 | 120.2 | 127.1 |
| Jul 2024 | 83.3 | 107.8 | 65.0 | 95.5 | 120.3 | 127.6 |
| Aug 2024 | 85.7 | 103.0 | 63.2 | 93.4 | 120.2 | 128.5 |
| Sep 2024 | 87.9 | 103.4 | 62.2 | 92.7 | 120.4 | 128.0 |
| Oct 2024 | 89.3 | 106.3 | 62.8 | 94.1 | 120.3 | 128.2 |
| Nov 2024 | 92.4 | 104.3 | 63.9 | 96.4 | 120.9 | 128.9 |
| Dec 2024 | 93.4 | 102.8 | 61.2 | 97.2 | 121.1 | 128.4 |
| Jan 2025 | 91.8 | 103.9 | 60.0 | 97.3 | 120.9 | 129.8 |
| Feb 2025 | 94.3 | 105.8 | 61.7 | 98.4 | 122.3 | 129.6 |
| Mar 2025 | 98.8 | 112.2 | 66.0 | 103.3 | 122.8 | 129.2 |
| Apr 2025 | 96.2 | 117.6 | 69.7 | 105.1 | 122.2 | 128.4 |
| May 2025 | 93.1 | 114.3 | 75.0 | 101.3 | 121.9 | 128.9 |
| Jun 2025 | 91.4 | 116.2 | 71.0 | 101.2 | 121.9 | 128.9 |
| Jul 2025 | 89.7 | 122.0 | 70.1 | 108.8 | 121.8 | 128.4 |
| Aug 2025 | 90.5 | 117.8 | 70.9 | 114.8 | 122.0 | 128.5 |
| Sep 2025 | 86.7 | 115.6 | 69.9 | 116.6 | 121.5 | 128.5 |
| Oct 2025 | 86.1 | 121.0 | 69.0 | 118.8 | 121.5 | 128.3 |
| Nov 2025 | 86.2 | 121.2 | 66.9 | 122.9 | 121.1 | 127.7 |
| Dec 2025 | 85.8 | 127.1 | 71.7 | 126.3 | 121.0 | 128.5 |
| Jan 2026 | 89.2 | 132.1 | 72.4 | 129.5 | 121.0 | 129.8 |
| Feb 2026 | 92.7 | 133.9 | 74.6 | 137.7 | 121.1 | 129.7 |
| Mar 2026 | 92.0 | 133.6 | 76.1 | 139.2 | 120.8 | 130.0 |
| Apr 2026 | 97.0 | 132.9 | 78.4 | 144.9 | 121.0 | 130.7 |
| May 2026 | 97.6 | 140.6 | 80.3 | 151.7 | 119.7 | 131.1 |
| Jun 2026 | 96.9 | 143.7 | 82.6 | 155.4 | 120.3 | 131.7 |
| Jul 2026 | 103.1 | 144.0 | 86.0 | 152.9 | 121.4 | 131.4 |
| Aug 2026 | 101.0 | 150.0 | 87.3 | 146.2 | 122.2 | 131.5 |
| Sep 2026 | 99.0 | 151.3 | 89.2 | 146.0 | 123.2 | 131.5 |
Material notes
Standing notes on what each measure covers and what it is not are on the materials page and below the charts. What is new this month, by material:
Softwood lumber fell 2.0% in September and is 15.4% above last December. Its year-over-year figure of 14.2% is measured against a September 2025 that was itself 1.3% below the September before, and the Septembers before that show −2.2%, −15.2% and +12.9%. The index is 1.0% below where it stood five years ago and far below its March 2022 peak of 540.7.
Copper wire and cable set another five-year high in September, at 607.7, and is 19.0% above December. The raw metal also set a five-year high: LME copper averaged 14,474 dollars per metric ton in September, 45.0% above a year ago. The product has risen less than the metal over the year, by 14.2 points (30.8% against 45.0%). In September the two moved almost together, +0.8% for the product and +1.0% for the metal.
Steel mill products rose 2.2% in September and are 24.4% above December and 43.4% above September 2024. The index is still 10.8% below where it stood five years ago, under its December 2021 peak of 449.7, and has climbed from a January 2025 low of 261.6.
Aluminum mill shapes were nearly unchanged in September (−0.1%) and remain below the June high of 394.4. LME aluminum rose 1.0% in the month and remains below its own May high of 3,666 dollars per metric ton. Over the year the product and the metal show nearly the same change, +25.2% and +23.7%, a gap of 1.5 points; over two years the product has risen more, +57.6% against +34.0%.
Gypsum products rose 0.8% in September to a five-year high of 488.9 and are 1.4% above September 2025. The narrower gypsum building materials index, which includes wallboard, was unchanged in the month and is 0.4% below a year ago, 1.8 points below the broader index's yearly change.
Ready-mix concrete was unchanged in September and is 2.3% above a year ago and 2.4% above December, just below its June five-year high of 396.0. The cement index was also unchanged and is 1.2% below a year ago; a year ago, in September 2025, cement stood at its five-year high of 360.5. Over the year, concrete's change exceeds cement's by 3.5 points. Concrete moved without cement.
Standing notes
What each measure covers, why it matters, and what it does not represent. These notes are the same in every edition; the paragraphs above say what is new.
What the measure covers. WPU0811 is the BLS producer price index for softwood lumber: what sawmills receive for dimension lumber, boards and timbers as they leave the mill, in index form with 1982 = 100, not seasonally adjusted. BLS builds it from lumber not edge worked and from softwood lumber made from purchased lumber, cut stock and dimension.
Why it matters. Framing is the largest single material line in most wood-frame residential work, and lumber is the most volatile of the six groups: within the past five years the index has risen and fallen by more than half within a year or two. A lumber claim needs a date attached to it more than any other.
What it is not. Not plywood, OSB, engineered wood, trusses or pressure-treated lumber, which BLS indexes separately. Not a delivered yard price, which adds freight, handling and dealer margin and moves on its own timing. Not a regional price; the index is national. A year-over-year figure for lumber can be large in either direction because the comparison month was itself unusual; the chart shows which.
What the measure covers. WPU10260314 is the BLS producer price index for copper wire and cable: what producers receive for building wire, power cable and similar manufactured products as they leave the plant, in index form with December 1986 = 100, not seasonally adjusted. Beside it, the edition reads the World Bank's monthly average of the LME copper settlement price (grade A cathode, U.S. dollars per metric ton), which is the raw metal.
Why it matters. Electrical work is priced largely on copper, and the raw metal is what moves in the news. The pair lets a reader see whether wire and cable followed the metal, lagged it, or moved by less, which is the usual pattern because fabrication, insulation and distribution costs sit between the two.
What it is not. The index is not copper plumbing tube, fittings, roofing copper or scrap. The LME price is a world benchmark in dollars per ton, not a U.S. delivered price, and it includes no fabrication. The gap between the two year-over-year figures is an observation about two series; it is not a margin, a markup or anyone's cost.
What the measure covers. WPU1017 is the BLS producer price index for steel mill products: what mills receive for sheet, plate, bars, structural shapes, pipe and tube and semifinished steel as they leave the mill, in index form with 1982 = 100, not seasonally adjusted. It is a broad group that BLS subdivides by product and by carbon, alloy and stainless grade.
Why it matters. Structural steel, rebar, decking, studs and pipe all begin as mill products, and mill pricing responds quickly to trade policy, energy costs and demand. Steel claims often cite a headline about tariffs; the index shows what mill prices did over the same months.
What it is not. Not fabricated or erected steel, not rebar installed, not hardware or fasteners, and not any one product: sheet and structural shapes can move differently within the group. Not a delivered price. The index does not say which product drove a month's change.
What the measure covers. WPU102501 is the BLS producer price index for aluminum mill shapes: what producers receive for sheet, plate, foil, extruded shapes and similar semifinished aluminum as it leaves the mill, in index form with 1982 = 100, not seasonally adjusted. Beside it, the edition reads the World Bank's monthly average of the LME aluminum settlement price (high-grade primary ingot, U.S. dollars per metric ton), the raw metal.
Why it matters. Windows, storefront, curtain wall, gutters, siding, flashing and much electrical and mechanical hardware are made from mill shapes. As with copper, the pair shows whether the manufactured product tracked the metal or moved on its own.
What it is not. Not finished products such as windows, doors or siding, which carry fabrication, glass, hardware and labor. The LME price is a world benchmark and not a U.S. delivered price; the regional premium that U.S. buyers pay above the LME price is not in either series. A gap between the two is not a cost.
What the measure covers. WPU137 is the BLS producer price index for gypsum products: wallboard and other gypsum building materials plus other gypsum products, in index form with 1982 = 100, not seasonally adjusted. Beside it, the edition reads WPU13710102, gypsum building materials (December 1993 = 100), the narrower index in which wallboard sits.
Why it matters. Drywall is in nearly every interior, and the index tends to hold within a narrow range for months and then move by several percent in one step, so a quiet stretch is not a guarantee about the next month.
What it is not. Neither index is the price of any one wallboard product, thickness or type, and neither includes installation, finishing or delivery. A broad gypsum-products index is not labeled here as the price of drywall. The two indexes have different base periods, so their levels are not comparable; their changes are.
What the measure covers. WPU1333 is the BLS producer price index for ready-mix concrete: what producers receive for concrete delivered from the plant, in index form with 1982 = 100, not seasonally adjusted. Beside it, the edition reads WPU1322, cement (hydraulic), the priced input, and the U.S. Geological Survey's monthly survey of portland and blended cement shipments from U.S. plants, in metric tons.
Why it matters. Foundations, slabs, sitework and most public work are priced on concrete, and the input and the product can move apart: aggregates, delivery, fuel and local plant competition sit between cement and a delivered yard of concrete. Cement shipments show whether the market behind a price move was busy or slack, several months after the fact.
What it is not. Cement is an input to concrete, not another name for it; the two indexes are kept apart. The concrete index is national; BLS also publishes regional ready-mix indexes, which are not read here. Not precast, block, aggregates or placement. Shipments are a volume, not a price, and USGS publishes them about four to five months after the month they describe, so they never describe the same month as the latest index value.
Context
What the evidence shows: for copper, the raw metal and the manufactured product rose in the same direction over the year, and the metal rose further. For aluminum, the two rose by close to the same amount over the year. Cement shipments from U.S. plants for January through June 2026 were 7.2% above the same months of 2025, and June alone was 10.4% above June 2025. Total housing starts in September were 7.4% below a year earlier at a seasonally adjusted annual rate of 1,221 (thousands of units), and 11.4% below December; the five-year low in the series was 1,182, in May 2026. Single-family starts were 2.6% above a year earlier at 859.
What the evidence does not show: why any of these moved. A higher raw-copper price is a plausible reason for a higher wire-and-cable index, and the timing is consistent with it, but the record does not establish that the one caused the other or how much of the product's rise the metal accounts for. The record contains prices, not policy, and does not attribute the rise in steel. Cement shipments rising faster than a year ago while the cement index sits slightly lower is consistent with a market that is busy without being tight, and equally consistent with other explanations the record cannot test. Lower housing starts alongside higher shipments describe two different things: starts measure new residential units, not all construction, and the shipments figure describes an earlier month.
What the evidence cannot connect: the shipments figure describes June; the price indexes describe September. The three-month gap is the source's publishing lag, and no inference across it is made.
Uncertainty
All six September index values are preliminary. BLS revises the most recent four months of a producer price index. This run's August values for several series differ from the preliminary August values the first edition quoted; the revised August levels are in this edition's numbers.json as each series' prior-month value. The first edition stands as published and is not changed by them.
Census also revised its August housing-starts estimates. The August levels in this run are 1,288 for total starts and 900 for single-family starts (thousands, SAAR), both different from the figures the first edition quoted. The single-family series in particular moves widely from month to month; Census starts are survey estimates with wide sampling error and are revised.
The USGS shipments figures are marked estimated by USGS and are published about three to five months after the month they describe. The latest month in this record is June 2026. Shipments are strongly seasonal, so a change from December or from one spring month to the next says little on its own; the comparison with the same months of 2025 is the more useful one, and it relies on prior-year figures USGS may itself have revised. The five-year window for this series is limited to what the current workbook holds, and its chart shows 18 months, not 60.
The World Bank benchmark is a monthly average of daily exchange settlements in dollars per metric ton. It is a world price, not a U.S. delivered price, and it includes no regional premium or fabrication. The gap between the metal and the product is an observation about two series, not a margin.
The edition page states which timestamp chain entry covers this edition's files and which authorities' tokens it holds. A timestamp shows the files existed unchanged by a date; it does not show that a source's figure was correct.
What the run flagged
The collection step flags conditions for the editor before the text is written: stale series, large moves, missing comparisons, preliminary values. They are listed as the run produced them.
| Flag | Series | Detail |
|---|---|---|
| PRELIMINARY | WPU0811 | 2026-09 is marked preliminary by the source and may be revised |
| LARGE_ANNUAL_MOVE | WPU10260314 | +30.8% year over year (2025-09 to 2026-09) |
| PRELIMINARY | WPU10260314 | 2026-09 is marked preliminary by the source and may be revised |
| LARGE_ANNUAL_MOVE | WPU1017 | +27.6% year over year (2025-09 to 2026-09) |
| PRELIMINARY | WPU1017 | 2026-09 is marked preliminary by the source and may be revised |
| LARGE_ANNUAL_MOVE | WPU102501 | +25.2% year over year (2025-09 to 2026-09) |
| PRELIMINARY | WPU102501 | 2026-09 is marked preliminary by the source and may be revised |
| PRELIMINARY | WPU137 | 2026-09 is marked preliminary by the source and may be revised |
| PRELIMINARY | WPU1333 | 2026-09 is marked preliminary by the source and may be revised |
| PRELIMINARY | WPU1322 | 2026-09 is marked preliminary by the source and may be revised |
| PRELIMINARY | WPU13710102 | 2026-09 is marked preliminary by the source and may be revised |
| LARGE_ANNUAL_MOVE | wb_copper_usd_mt | +45.0% year over year (2025-09 to 2026-09) |
| LARGE_ANNUAL_MOVE | wb_aluminum_usd_mt | +23.7% year over year (2025-09 to 2026-09) |
| LARGE_MONTHLY_MOVE | usgs_cement_shipments_us_mt | +12.5% month over month (2026-05 to 2026-06) |
| LARGE_MONTHLY_MOVE | census_starts_total_saar | -5.2% month over month (2026-08 to 2026-09) |
The record
Four sources were fetched on 29 October 2026 and retained byte for byte: the BLS public API response for the eight PPI series (ten years each), the World Bank's monthly commodity workbook, the USGS cement workbook for June 2026, and the Census housing-starts time-series workbook. Every figure above appears in numbers.json; the formulas are in dictionary.md; the rows the figures were computed from are in data.csv, and the charted windows are in series.csv. No correction has been made to this edition.
Suggested citation
Cite the edition and its version. If a later revision changes a figure, the revision is dated on this page and the original text stays visible. Field Assembly's text, tables and charts here are licensed CC BY 4.0; source files under evidence/ keep their publishers' terms. See Cite and reuse.
Download
- data.csvEvery indicator row in data run 2026-10-29T171741Z: 1679 rows, source-reported values at parsed precision, each with its source file and retrieval time
- series.csvThe 5-year window of each series as charted, with rebased values for the six core indexes
- measures.csvEvery figure the edition quotes, calculated measures marked
- dictionary.mdColumn definitions, units, formulas, revision policy, missing-value convention
- numbers.json · evidence.json · exceptions.json · issue.mdThe record as kept in the repository
The record behind this edition
Each retained file is the response as received, byte for byte, with its HTTP headers beside it and its SHA-256 in evidence.json. Methods and source list: methodology.
Retained source files (6)
- bls/ppi.jsonhttps://api.bls.gov/publicAPI/v1/timeseries/data/ · retrieved 2026-10-29T17:17:41Z · SHA-256 9c438ff64ae86086…
- worldbank_cmo/landing.htmlhttps://www.worldbank.org/en/research/commodity-markets · retrieved 2026-10-29T17:17:44Z · SHA-256 f9c21410d6a938db…
- worldbank_cmo/monthly_xlsx.xlsxhttps://thedocs.worldbank.org/en/doc/74e8be41ceb20fa0da750cda2f6b9e4e-0050012026/related/CMO-Historical-Data-Monthly.xlsx · retrieved 2026-10-29T17:17:46Z · SHA-256 ea1c350827878ea3…
- usgs_cement_mis/landing.htmlhttps://www.usgs.gov/centers/national-minerals-information-center/cement-statistics-and-information · retrieved 2026-10-29T17:17:49Z · SHA-256 0f6e25b9f126dcd6…
- usgs_cement_mis/mis_xlsx.xlsxhttps://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/media/files/mis-202606-cemen.xlsx · retrieved 2026-10-29T17:17:54Z · SHA-256 b96f30c378b1ae8d…
- census_nrc_starts/starts_xlsx.xlsxhttps://www.census.gov/construction/nrc/xls/starts_cust.xlsx · retrieved 2026-10-29T17:17:57Z · SHA-256 a93609dae2df7674…
Timestamp record
Timestamp chain entry 2026-10-29T172635Z, 81 files, anchored 2026-10-29T17:26:35Z with RFC 3161 tokens from digicert, freetsa. An OpenTimestamps proof is stored alongside. Files: entry, manifest, tokens 2026-10-29T172635Z-digicert.tsr, 2026-10-29T172635Z-freetsa.tsr.
A timestamp shows that these files existed unchanged by that time. It does not show that a source's figure was correct.